GKV Architects Propose Exterior Renovations For Historic Building on the Upper West Side


GKV Architects has unveiled proposals to renovate an present luxurious rental property at 240 West 73rd Road on the Upper West Side, Manhattan. Often known as The Tempo, the constructing is positioned within the West Finish-Collegiate Historic District and will ultimately be renamed ‘The Penelope.’

The constructing initially debuted within the late 1920s as The Resort Commander. Designed by architect Leo F. Knust, the construction’s facade is comprised of beige brick, granite, and limestone masonry. Contemplating the construction’s historic location and “architecturally important facade,” the challenge crew is required to hunt specific approval from New York Metropolis’s Landmarks Preservation Commission. To assist guarantee all historic artifacts and architectural components are correctly preserved or changed the place required, GKV Architects is working carefully with preservation specialists Higgins Quasebarth & Partners.

The proposed scope of labor is primarily restricted to the constructing’s north-facing facade alongside 73rd Road.

Starting on the floor ground, the challenge crew intends to exchange the prevailing glass and steel cover and plaque with a brand new bronzed steel marquee and signage. Renderings additionally reveal the substitute of the prevailing primary entrance, the set up of latest double-hung home windows on both facet of the entryway, new devoted entrances for an on-site medical workplace and repair employees, and state-of-the safety cameras.

Existing conditions (left) and proposed replacement (right) of building canopy - GKV Architects

Present situations (left) and proposed substitute (proper) of constructing cover – GKV Architects

Proposed facade and canopy at 240 West 73rd Street - GKV Architects

Proposed facade and cover at 240 West 73rd Road – GKV Architects

Above the bottom ground, the challenge crew has proposed the removing of all PTAC items. The ensuing voids within the facade could be crammed with concrete and specked gray brick to match present situations.

On the roof of the construction, the challenge crew has proposed the set up of VRF condensing items to enhance the constructing’s vitality efficiency, substitute of present mechanical screens, and development of a brand new stair bulkhead in a equally hued stucco materials.

The growing agent answerable for the challenge is listed as Aimco, twin proprietor and property administration agency for the residential constructing.

View of existing roof (left) and proposed alterations (right) - GKV Architects

View of present roof (left) and proposed alterations (proper) – GKV Architects

View of existing structure and roof mechanical (left) versus updated massing (right) - GKV Architects

View of present construction and roof mechanical (left) versus up to date massing (proper) – GKV Architects

Subscribe to YIMBY’s every day e-mail

Follow
 the YIMBYgram for real-time picture updates
Like YIMBY on Fb
Follow YIMBY’s Twitter for the newest in YIMBYnews





Source link

Leave a Reply

Your email address will not be published. Required fields are marked *

Close

Fatal error: Allowed memory size of 67108864 bytes exhausted (tried to allocate 51495 bytes) in /home/content/52/11237452/html/celebratyworldorder/wp-includes/wp-db.php on line 1972